/

/

Problem analysis

No later than week 6 of sick leave

Problem analysis by the company doctor

The problem analysis is the first document the UWV wants to see from the employer when an employee is on long-term sick leave. It must be ready by week six at the latest, and only a registered company doctor (occupational physician) may draw it up. Flexbedrijfsarts connects the employer with a registered company doctor within 24 hours, even if week six is almost over. Through Flexbedrijfsarts, a consultation with problem analysis costs 359 euros, excluding VAT.

A selection of our satisfied clients

  • Logo of AIDS Healthcare Foundation, client of Flexbedrijfsarts
  • Logo of Renon Power, client of Flexbedrijfsarts
  • Logo of SAJ, client of Flexbedrijfsarts
  • Logo of Channel Technologies, client of Flexbedrijfsarts
  • Logo of Hitachi Solutions, client of Flexbedrijfsarts
  • Logo of Quorn, client of Flexbedrijfsarts
  • Logo of Subway, client of Flexbedrijfsarts
  • Logo of Techary, client of Flexbedrijfsarts
  • Logo of Kubus, client of Flexbedrijfsarts
  • Logo of Oasis Rotterdam, client of Flexbedrijfsarts
  • Logo of Anterra Capital, client of Flexbedrijfsarts
  • Logo of Architech, client of Flexbedrijfsarts
  • Logo of Mondzorg Nieuwkoop, client of Flexbedrijfsarts
  • Logo of Care4sure GGZ, client of Flexbedrijfsarts
  • Logo of Kos Bouw, client of Flexbedrijfsarts
  • ZorgLogistics

  • Logo of VDH Recruitment, client of Flexbedrijfsarts
  • Logo of Fusernet, client of Flexbedrijfsarts
  • Logo of Hitachi Solutions, client of Flexbedrijfsarts
  • Logo of Subway, client of Flexbedrijfsarts
  • Logo of Quorn, client of Flexbedrijfsarts
  • Logo of AIDS Healthcare Foundation, client of Flexbedrijfsarts
  • Logo of Buitenaards, client of Flexbedrijfsarts
  • Logo of Stichting RTGS, client of Flexbedrijfsarts
  • Logo of Zintri, client of Flexbedrijfsarts
  • Logo of The Social Brand Club, client of Flexbedrijfsarts
  • Logo of Jim Exclusieve Catering, client of Flexbedrijfsarts
  • Logo of De Watertuin Abcoude, client of Flexbedrijfsarts
  • Logo of Nova Sky Stories, client of Flexbedrijfsarts
  • Logo of Tojina Schoonmaak en Glazenwasserij, client of Flexbedrijfsarts
  • FH Infra

  • Logo of Quist Schoenen, client of Flexbedrijfsarts
  • Logo of Kinderopvang De Wielenweide, client of Flexbedrijfsarts
  • Horecagroep Limburg

  • Logo of DEB Koncept, client of Flexbedrijfsarts
  • Logo of WRZ Service, client of Flexbedrijfsarts
  • Logo of Black Pepper Grill, client of Flexbedrijfsarts
  • Logo of By Castro, client of Flexbedrijfsarts
  • Logo of Artventura, client of Flexbedrijfsarts
  • Logo of Life's a Peach, client of Flexbedrijfsarts
  • Gemu Mania

  • MMT Transport

  • Quantbox

  • Logo of Chamayre's Touch, client of Flexbedrijfsarts
  • Huizer Compliance

Problem analysis: short answers

When must the problem analysis be ready?

By week six of sick leave at the latest. The action plan follows in week eight.

What is a revision of the problem analysis?

An update of the problem analysis by the company doctor when the situation changes substantially, recorded on the UWV form Bijstelling probleemanalyse (revision of the problem analysis). The employer and employee then adjust the action plan.

Who draws up the problem analysis?

Only a registered company doctor. An arbo doctor can hold the consultation, but the company doctor signs.

What does a problem analysis cost?

A consultation with problem analysis costs 359 euros excluding VAT.

What happens if the problem analysis is late?

The employer then has it drawn up immediately and records the reason for the delay. The UWV only imposes a wage sanction if the delay meant that opportunities for work were missed.

Is the employer told the diagnosis?

No. The employer reads what the employee can still do, what the limitations are and what recovery is expected.

The Gatekeeper Act process from week 1 to 104

Each step has a fixed week and a fixed owner. The highlighted step relates to this topic; the other steps link to their own explanations.

1. Week 1Employer
Sick report
The employee reports sick in accordance with the absence protocol. From that moment, the deadlines start to run.
2. No later than week 6Company doctor
Problem analysis
The company doctor describes what the employee can still do and what is needed to return to work.
3. No later than week 8Together
Action plan
The employer and the employee record the agreements and evaluate them at least every six weeks.
4. Week 42Employer
Notification to the UWV
The employer reports the employee on long-term sick leave to the UWV.
5. Week 52Together
First-year evaluation
A review of the first year. Is the plan still feasible, or does other work need to be considered?
6. No later than week 91Together
Final evaluation
The action plan is concluded; the company doctor provides the current assessment (actueel oordeel).
7. No later than week 93UWV
WIA application
After the letter from the UWV around week 88, the employee applies for the WIA, with the reintegration report that the employer has drawn up.
8. Week 104UWV
Assessment by the UWV
If enough has been done, the continued payment of wages during illness ends in principle. If not, the UWV can impose a wage sanction of up to 52 weeks.

When is a problem analysis in week 6 mandatory?

A problem analysis is mandatory by week 6 at the latest if the company doctor expects the sick leave to become long-term. If the company doctor does not expect long-term sick leave, for example because the employee is expected to be fully back at work shortly, no problem analysis is needed in week 6.

If it only becomes clear after week 6 that the sick leave will last a long time, the employer asks the company doctor for an assessment straight away. The action plan follows within two weeks of that assessment, so that deadline moves too.

The employer and employee may jointly depart from these deadlines if they record the reason. If the employee has no capacity to work and no recovery is expected, a limited problem analysis is sufficient, without advice for an action plan.

Problem analysis by situation

Situation

Problem analysis

Deadline

The company doctor expects long-term sick leave

Mandatory

By week 6 at the latest

Long-term sick leave only becomes clear later

Mandatory

Immediately once it becomes clear

The company doctor expects short-term sick leave

Not required

None

No capacity to work and no recovery expected

Limited, without advice for an action plan

By week 6 at the latest

Employer and employee jointly depart from the deadline

Mandatory

Later, with the reason in the file

The content of a problem analysis

Four components, none of which contains medical information the employer is not allowed to know. The company doctor sends the document to the employer, and the employee receives a copy.

The nature of the symptoms, described functionally

No diagnosis or medical data, but what the symptoms mean for the work.

Limitations and capabilities

What the employee can and cannot do at present, in hours and in type of work.

Expected recovery

How recovery is expected to progress and when a further assessment makes sense.

Advice on reintegration

Which steps make sense, and which options are in view: the employee's own work, other work or work with another employer.

The revision of the problem analysis

A problem analysis is a snapshot. If the situation changes substantially, a revision is needed: an updated version of the same document, drawn up by the company doctor.

This happens, for example, when a diagnosis changes, when surgery becomes necessary, when recovery clearly differs from what was expected, or when a return to the employee's own work turns out not to be feasible. In that last case, the revision is the document on which the discussion about other work or second track reintegration is based.

When the UWV makes its assessment after two years, it looks at the entire file. If the file contains a problem analysis from week six and then nothing for two years, although the situation clearly changed along the way, that gap is difficult to close afterwards. A revision at the time is much easier.

Flexbedrijfsarts arranges the revision during a follow-up consultation, and the case manager keeps track of when it is due.

Triggers for a revision

A different diagnosis, surgery or hospital admission, recovery that clearly differs from what was expected, or a return to the employee's own work that turns out not to be feasible. The first-year evaluation is also a fixed review point.

Revision of the problem analysis: timing, the form and the employer's role

A revision is needed as soon as reality departs from the first analysis: a different diagnosis, surgery or hospital admission, recovery that is faster or slower than expected, or an employee who will clearly not return to their own work. The first-year evaluation is also a fixed point to check that the analysis still holds.

The company doctor records the revision, in practice on the UWV form Bijstelling probleemanalyse or in the doctor's own report covering the same points: what has changed, what that means for the employee's capacity for work and what the new reintegration advice is. As with the first analysis, the employer receives only the part it needs: limitations, capabilities and advice, without the diagnosis.

It is then up to the employer and employee to adjust the action plan to the new advice and record this as a revision of the action plan. For the UWV, a revised problem analysis without a revised plan is only half the story. At Flexbedrijfsarts, the revision takes place in a follow-up consultation costing 239 euros excluding VAT. The case manager indicates when it is due.

1

Follow-up consultation

The company doctor revises the analysis

What has changed, what that means for the capacity for work and what the new advice is.

2

For the employer

The employer receives the employer's part

Limitations, capabilities and advice, without the diagnosis.

3

Together

Revise the action plan

Adjust the plan to the new advice and record the change.

The structure of a problem analysis

Employers often look for an example, usually because they want to know what they will receive. The structure is always the same; the content differs per employee. The employer's version contains the following.

Reason and date

When the employee went off sick and how long the sick leave is expected to last.

Limitations and capabilities

Described in functional terms: how many hours the employee can work, which tasks are possible and which are not for now.

Expected recovery

In weeks or months, with the uncertainty stated.

Reintegration advice

Phased return schedule, adjustments to the work or workplace, and whether the employee's own work remains the goal.

Follow-up

When the next consultation is scheduled and when a revision is likely.

What does the UWV do with the problem analysis?

The UWV only sees the problem analysis at the WIA application, or earlier if the employee leaves employment after at least six weeks of illness, as part of the reintegration report. It then checks that the analysis was in place in week 6, that the reintegration was based on it and that later changes led to a revision. If the document is missing, or nothing was revised in two years although the situation changed, this can result in a wage sanction of up to 52 weeks of additional wages.

If the employer or the employee requests a UWV expert opinion (deskundigenoordeel) in the meantime, the problem analysis is the starting point there too: the UWV insurance physician checks that the company doctor's advice was followed.

The problem analysis within the sick leave process

The problem analysis does not stand alone. It is the starting point for the action plan and comes back at the end in the reintegration report.

Week 1

Sick report. All deadlines run from this point.

Week 6

The problem analysis must be ready, drawn up by the company doctor.

Week 8

Action plan, drawn up by the employer together with the employee on the basis of the analysis.

Every 6 weeks

Evaluation. If the situation changes substantially, the company doctor revises the problem analysis.

Week 52

First-year evaluation, in which employer and employee look back and set the course for year two.

Week 93

Reintegration report to the UWV, containing the problem analysis, the revisions and the current assessment (actueel oordeel).

What are the consequences of a late problem analysis?

A late problem analysis does not automatically lead to a wage sanction. The UWV only assesses the file at the WIA application, by week 93 at the latest, or earlier if an employee leaves employment after at least six weeks of illness. It first looks at the result of the reintegration. If the employee is back at work, in work that suits their capabilities and is lasting, the route there no longer matters.

If the result is not satisfactory, the UWV assesses the efforts made. A problem analysis that came far too late only counts if it led to too little or the wrong reintegration, for example if the employee stayed at home for weeks while work was already possible. Without valid grounds, the UWV then extends sick pay (continued payment of wages) by up to 52 weeks. A delay at the health and safety service or the company doctor does not count as valid grounds: they work under the employer's responsibility.

Catching up on a late problem analysis

Report the first day of illness and state that week 6 has passed or is about to pass

Engage a company doctor, matched within 24 hours, on location or by video call

Have the company doctor draw up the problem analysis after all

Record the action plan with the employee within two weeks

Record in the file why the deadline was missed and what happened in the meantime

How does an employer catch up on a late problem analysis?

By having a company doctor draw up the problem analysis immediately, drawing up the action plan within two weeks of that and recording in the file why the deadline was missed. The employer also records in the same file what happened in the weeks before the consultation.

If the employer does not yet have a company doctor or health and safety service, that is the first step. Every employer must use a company doctor or a certified health and safety service for sick leave support. Flexbedrijfsarts connects the employer with a BIG-registered company doctor within 24 hours, per consultation and without a contract. The consultation takes place on location or by video call. The doctor decides whether a visit to the workplace is needed.

A consultation with problem analysis costs 359 euros and an urgent consultation 419 euros. The action plan with a case manager costs 210 euros. If the sick leave has been going on for some time and it is unclear which documents are missing, a scan of the gatekeeper file (475 euros) identifies the gaps. All amounts exclude VAT.

Frequently asked questions

Questions about the problem analysis

When is a problem analysis carried out for an employee on sick leave?

By week six of sick leave at the latest. In practice, the consultation is scheduled around week four or five so that the company doctor can complete the document on time. If it is clear early on that the sick leave will last a long time, the problem analysis may be done earlier.

Who may draw up a problem analysis?

Only a doctor registered as a company doctor in the BIG register. An arbo doctor can hold the consultation and prepare the document, but the company doctor bears final responsibility and signs it.

What does a problem analysis contain?

The nature of the symptoms in functional terms, the employee's limitations and capabilities, the expected recovery and advice on reintegration. No diagnosis or medical data: these are covered by professional confidentiality.

When does the company doctor revise the problem analysis?

When the situation changes substantially: recovery is faster or slower than expected, the limitations change, or the first track turns out not to be feasible. The revision is included in the reintegration report to the UWV.

What are the consequences of a late problem analysis?

A wage sanction only follows if the delay meant that opportunities for work were missed. At the WIA application, the UWV first looks at the result of the reintegration. If that is not satisfactory and the late problem analysis held up reintegration, the UWV can extend sick pay by up to 52 weeks, unless the employer has valid grounds.

What does a problem analysis cost?

A consultation with problem analysis costs 359 euros excluding VAT. This covers the consultation and the report. The employer sees the rate in advance and pays per consultation.

Does an employer get to see the problem analysis?

Yes. The company doctor sends the document to the employer and the employee receives a copy. It contains no medical information the employer is not allowed to know.

When is a revision of the problem analysis needed?

When the situation changes substantially: a different diagnosis, surgery, recovery that clearly differs from what was expected, or the realisation that the employee's own work is not feasible. The company doctor draws up the revision during a follow-up consultation. The UWV assesses the entire file after two years, so a revision at the time prevents a gap.

Who draws up the revision of the problem analysis?

The same party as for the original: the document is drawn up under the responsibility of a registered company doctor. An arbo doctor can hold the consultation and prepare the document, with a company doctor overseeing it.

What does a problem analysis look like?

A problem analysis always has the same structure: the reason for and date of the sick report, the limitations and capabilities in functional terms, the expected recovery, the reintegration advice and the follow-up. The content differs per employee, and the employer's version does not include the diagnosis.

What is a revision of the problem analysis?

An updated version of the problem analysis, drawn up by the company doctor when the situation has changed substantially. The UWV has a separate form for it. After a revision, the employer and employee also adjust the action plan together.

How does an employer remedy a late problem analysis?

By having the company doctor draw up the problem analysis immediately, drawing up the action plan within two weeks of that and recording in the file why the deadline was missed. The UWV later assesses whether reintegration was handled properly from then on.

Is a problem analysis always mandatory in week 6?

No, only if the company doctor expects the sick leave to become long-term. If that only becomes clear later, the problem analysis follows immediately, even after week 6. The employer and employee may depart from the deadline for good reason if they record that reason.

What if an employer still has no company doctor after six weeks of sick leave?

The employer then engages a company doctor immediately. Every employer must use a company doctor or a certified health and safety service for sick leave support. Flexbedrijfsarts connects the employer with a BIG-registered company doctor within 24 hours, per consultation and without a contract. A consultation with problem analysis costs 359 euros excluding VAT.

Is a delay at the health and safety service a valid reason for a late problem analysis?

No. The health and safety service and the company doctor work under the employer's responsibility, so the UWV does not accept their delay as valid grounds. However, the late problem analysis only counts if opportunities for work were missed as a result. It helps to record when and how the employer contacted the health and safety service.

When does the UWV check that the problem analysis was on time?

At the WIA application, by week 93 at the latest, as part of the reintegration report. If an employee leaves employment after at least six weeks of illness, the UWV also assesses the reintegration report when the employer reports the employee as leaving employment while ill, except where the employer is a self-insurer for the Ziektewet (Sickness Benefits Act). The employer does not include the problem analysis with the 42nd-week notification.

Further reading

The problem analysis is part of the wider sick leave process. Read how Flexbedrijfsarts deploys the company doctor, what a case manager does during long-term sick leave, or what a second opinion can mean for an employer when the assessment is in doubt. All company doctor rates are listed in one place.

A problem analysis before week six

State when the employee went off sick, and Flexbedrijfsarts will find a company doctor who can complete the analysis on time. On working days, we call back within 2 hours.