/

/

Sick leave support

From sick report to return to work

Sick leave support for employers

An employee on sick leave means conversations for the employer, deadlines under the Gatekeeper Improvement Act (Wet verbetering poortwachter) and a file that the UWV assesses after two years. A missed deadline can lead to a wage sanction from the UWV. Flexbedrijfsarts takes over the operational side, without an annual contract. A case manager monitors the deadlines and prepares the documents, and the company doctor carries out the consultations; responsibility stays with the employer.

A selection of our satisfied clients

  • Logo of AIDS Healthcare Foundation, client of Flexbedrijfsarts
  • Logo of Renon Power, client of Flexbedrijfsarts
  • Logo of SAJ, client of Flexbedrijfsarts
  • Logo of Channel Technologies, client of Flexbedrijfsarts
  • Logo of Hitachi Solutions, client of Flexbedrijfsarts
  • Logo of Quorn, client of Flexbedrijfsarts
  • Logo of Subway, client of Flexbedrijfsarts
  • Logo of Techary, client of Flexbedrijfsarts
  • Logo of Kubus, client of Flexbedrijfsarts
  • Logo of Oasis Rotterdam, client of Flexbedrijfsarts
  • Logo of Anterra Capital, client of Flexbedrijfsarts
  • Logo of Architech, client of Flexbedrijfsarts
  • Logo of Mondzorg Nieuwkoop, client of Flexbedrijfsarts
  • Logo of Care4sure GGZ, client of Flexbedrijfsarts
  • Logo of Kos Bouw, client of Flexbedrijfsarts
  • ZorgLogistics

  • Logo of VDH Recruitment, client of Flexbedrijfsarts
  • Logo of Fusernet, client of Flexbedrijfsarts
  • Logo of Hitachi Solutions, client of Flexbedrijfsarts
  • Logo of Subway, client of Flexbedrijfsarts
  • Logo of Quorn, client of Flexbedrijfsarts
  • Logo of AIDS Healthcare Foundation, client of Flexbedrijfsarts
  • Logo of Buitenaards, client of Flexbedrijfsarts
  • Logo of Stichting RTGS, client of Flexbedrijfsarts
  • Logo of Zintri, client of Flexbedrijfsarts
  • Logo of The Social Brand Club, client of Flexbedrijfsarts
  • Logo of Jim Exclusieve Catering, client of Flexbedrijfsarts
  • Logo of De Watertuin Abcoude, client of Flexbedrijfsarts
  • Logo of Nova Sky Stories, client of Flexbedrijfsarts
  • Logo of Tojina Schoonmaak en Glazenwasserij, client of Flexbedrijfsarts
  • FH Infra

  • Logo of Quist Schoenen, client of Flexbedrijfsarts
  • Logo of Kinderopvang De Wielenweide, client of Flexbedrijfsarts
  • Horecagroep Limburg

  • Logo of DEB Koncept, client of Flexbedrijfsarts
  • Logo of WRZ Service, client of Flexbedrijfsarts
  • Logo of Black Pepper Grill, client of Flexbedrijfsarts
  • Logo of By Castro, client of Flexbedrijfsarts
  • Logo of Artventura, client of Flexbedrijfsarts
  • Logo of Life's a Peach, client of Flexbedrijfsarts
  • Gemu Mania

  • MMT Transport

  • Quantbox

  • Logo of Chamayre's Touch, client of Flexbedrijfsarts
  • Huizer Compliance

Sick leave support: the short answers

What is sick leave support?

The entire process from sick report to return to work: consultations, monitoring deadlines, building the file and turning the advice into work.

Who is responsible for sick leave support?

The employer. That responsibility cannot be outsourced, not even to a health and safety service. Carrying out the work can.

Who makes the medical assessment of an employee on sick leave?

Only the company doctor. The employer may not ask about symptoms or a diagnosis.

What does sick leave support cost?

Per consultation, from 239 euros excluding VAT. No fee per employee per year.

Does sick leave support require a contract?

No. Under the custom arrangement (maatwerkregeling), the employer engages support when it is needed.

The Gatekeeper Act process from week 1 to 104

Each step has a fixed week and a fixed owner. The highlighted step relates to this topic; the other steps link to their own explanations.

1. Week 1Employer
Sick report
The employee reports sick in accordance with the absence protocol. From that moment, the deadlines start to run.
2. No later than week 6Company doctor
Problem analysis
The company doctor describes what the employee can still do and what is needed to return to work.
3. No later than week 8Together
Action plan
The employer and the employee record the agreements and evaluate them at least every six weeks.
4. Week 42Employer
Notification to the UWV
The employer reports the employee on long-term sick leave to the UWV.
5. Week 52Together
First-year evaluation
A review of the first year. Is the plan still feasible, or does other work need to be considered?
6. No later than week 91Together
Final evaluation
The action plan is concluded; the company doctor provides the current assessment (actueel oordeel).
7. No later than week 93UWV
WIA application
After the letter from the UWV around week 88, the employee applies for the WIA, with the reintegration report that the employer has drawn up.
8. Week 104UWV
Assessment by the UWV
If enough has been done, the continued payment of wages during illness ends in principle. If not, the UWV can impose a wage sanction of up to 52 weeks.

Roles and responsibilities in a sick leave case

The division of roles is laid down by law, and this is often where employers go wrong. The employer is and remains responsible for reintegration, even if everything has been outsourced. At the end of the second year of sick leave, the UWV holds the employer to account, not the health and safety service.

The company doctor handles the medical side: the doctor talks to the employee, determines the capacity for work and draws up the problem analysis. The employer hears what the employee can still do, not what is wrong. A case manager sits in between, monitoring the deadlines, keeping the file up to date and making sure the advice is acted on.

In small organisations without an HR department, that middle role usually goes unfilled. That is the part Flexbedrijfsarts takes over.

Employer

Responsible for reintegration

Even if everything has been outsourced. After two years, the UWV holds the employer to account, not the health and safety service.

Company doctor

The medical side

Talks to the employee, determines the capacity for work and draws up the problem analysis.

Case manager

The process in between

Monitors the deadlines, keeps the file up to date and makes sure the advice is acted on.

The four types of absence

Sick leave support often distinguishes between four types of absence, which helps decide who needs to be brought in. White absence is demonstrable illness: that is what a company doctor is for. Grey absence is the borderline case: someone who could do some work but still reports sick. Black absence means being reported sick without being ill. Pink absence is the reverse: present, but not productive.

Only with white absence is a medical assessment the answer. With grey and black absence, the solution lies in the conversation between employer and employee, and a company doctor cannot help. Flexbedrijfsarts says so when that is the case.

White absence

Demonstrably ill

A medical assessment is the answer: this is what the company doctor is for.

Grey absence

Borderline case

Someone could do some work but still reports sick. The solution lies in the conversation.

Black absence

Not ill, but reported sick

The solution lies in the conversation between employer and employee, not with the company doctor.

Pink absence

Present, not productive

At work, but not productive. There is no sick report.

What does sick leave support involve, step by step?

Sick leave support starts on the day of the sick report and only ends when the employee is fully back at work or the UWV has made its assessment after two years. In between is a fixed sequence: contact in the first week and agreement on the next steps, a first consultation with the company doctor if the absence looks set to last more than a few weeks, the problem analysis in week 6, the action plan in week 8, an evaluation every six weeks, the notification to the UWV in week 42, the first-year evaluation in week 52, second track reintegration if necessary, and the final evaluation and the reintegration report around week 91.

Each step produces a document for the file, and each step has an owner. Sick leave support is therefore not a feeling or an attitude, but a series of actions at fixed points, recorded for the UWV to read later. The employer may choose who carries out the actions, but not whether they happen.

The sick leave process

fixed milestones

Contact and agreements

week 1

Contact in the first week and agreement on the next steps.

First consultation

after a few weeks

With the company doctor, if the absence looks set to last more than a few weeks.

Problem analysis

week 6

By the company doctor.

Action plan

week 8

By employer and employee together.

Evaluation

every 6 weeks

Adjusting the action plan where necessary.

Notification to the UWV

week 42

First-year evaluation

week 52

Followed by second track reintegration if necessary.

Final evaluation and reintegration report

around week 91

Each step produces a document for the file that the UWV reads later.

The sick leave meeting: what is and is not discussed

The sick leave meeting is the conversation the employer or manager has with the employee on sick leave, separate from the consultation with the company doctor. It covers three things: what the employee can still do at the moment, what is needed to return to work, and when employer and employee will next speak. Record the agreements briefly and send them to the employee; those notes later serve as proof that contact was maintained.

Symptoms, diagnosis and treatment stay off the table. The employer may not ask about them, and they may not be recorded either, even if the employee raises them unprompted. Asking further anyway creates a privacy problem and a file that cannot be used. So keep the conversation to work and agreements, and leave medical questions to the company doctor. A good rhythm is a brief check-in every two to three weeks, more often if something changes.

To discuss

Work and agreements

What the employee can still do at the moment

What is needed to return to work

When employer and employee will next speak

Not to discuss

Symptoms and treatment

Symptoms and diagnosis

Treatment

Do not record these either, even if the employee raises them

Absence coach, case manager or company doctor

Three titles that are often confused. The company doctor is the only one who makes a medical assessment: the company doctor determines the capacity for work, signs the problem analysis and the current assessment (actueel oordeel), and is bound by medical confidentiality. The case manager runs the process around it: deadlines, action plan, notifications to the UWV and the file, without medical information. An absence coach is not a statutory role; it is usually a case manager who also guides the conversations with the employee and the manager.

For the UWV, only one thing counts: that the steps were taken by someone authorised to take them. An absence coach who writes the problem analysis is a problem; a case manager who prepares the action plan and a company doctor who determines the capacity for work is how it should work.

Outsourcing sick leave support: what the employer hands over and what it costs

Outsourcing means that a case manager monitors the deadlines, drafts the documents and handles contact with the company doctor and the UWV, while the company doctor carries out the consultations. What cannot be handed over is the responsibility: after two years the UWV holds the employer to account, and the employer holds the conversations with the employee personally. What the employer no longer has to deal with is tracking week numbers and forms, and the question of whether the file will hold up later.

With a health and safety service, the employer pays a fixed amount per employee per year, plus a rate per service when someone is ill. With Flexbedrijfsarts, the employer pays only for the services used: 299 euros for a first consultation, 239 euros for a follow-up consultation, 210 euros for the action plan, 180 euros for the week 42 notification and 239 euros for the first-year evaluation, excluding VAT. For a company with twenty employees and one long-term sick leave case per year, that is a fraction of an annual contract; with structurally high absence, a contract can work out cheaper. Run the numbers using the absence figures for the past two years.

Rates at Flexbedrijfsarts

per service

First consultation

299 euros

Follow-up consultation

239 euros

Action plan

210 euros

Notification to the UWV in week 42

180 euros

First-year evaluation

239 euros

All amounts excluding VAT. No fixed amount per employee per year.

Rates

The employer pays per consultation and knows the rate in advance. No subscription, no fee per employee and no notice period.

Introduction and intake

Free

First consultation

€299

Follow-up consultation

€239

Consultation with problem analysis

€359

Urgent consultation

€419

Preventive consultation

€299

Frequently asked questions

Questions about sick leave support

What is sick leave support?

Sick leave support is the full set of steps between the sick report and the return to work: consultations with the company doctor, monitoring the Gatekeeper Act deadlines, building the file and translating the medical advice into adapted work. The employer is legally responsible for it, even if the work is outsourced.

What is discussed in a sick leave meeting?

What the employee can still do, what is needed to return to work and when employer and employee will next speak. Symptoms, diagnosis and treatment are not discussed: the employer may not ask about them. That part belongs with the company doctor, who is bound by medical confidentiality.

What are the 4 types of absence?

White absence means being demonstrably ill. Grey absence is the borderline case, in which someone might be able to do some work but still reports sick. Black absence means reporting sick without being ill. Pink absence means being present without being able to be productive. Only with white absence does a medical assessment help.

Is an absence coach the same as a company doctor?

No. A company doctor is a BIG-registered doctor and the only one permitted to give a medical assessment and draw up the problem analysis. An absence coach or case manager guides the process, monitors deadlines and holds conversations, but gives no medical assessment and signs no statutory documents.

Can sick leave support be outsourced without a health and safety service contract?

Yes. Under the custom arrangement (maatwerkregeling), the employer organises occupational health care itself, with the consent of the works council or staff representation, and brings in support when needed. The statutory obligations are the same as under a health and safety service contract.

What does sick leave support cost?

At Flexbedrijfsarts, the employer pays per consultation: 299 euros for a first consultation, 239 euros for a follow-up consultation and 359 euros if a problem analysis is included, all excluding VAT. There is no fixed amount per employee per year, so with little sick leave the costs stay low.

Does the employer remain responsible when sick leave support is outsourced?

Yes, always. The Gatekeeper Improvement Act (Wet verbetering poortwachter) places the responsibility with the employer. At the end of the second year of sick leave, the UWV assesses whether the employer has done enough and, if not, can extend sick pay (continued payment of wages) by up to 52 weeks.

How often does an employer keep in touch with an employee on sick leave?

The law does not set a fixed number, but the UWV expects regular contact that is recorded. In practice, a short conversation every two to three weeks works well, more often if the situation changes, and in any case at each evaluation of the action plan, every six weeks.

What does an absence coach do?

An absence coach guides the conversations between employer, manager and the employee on sick leave and helps them agree on a return to work. It is neither a statutory nor a medical role; only the company doctor determines the capacity for work. A case manager often fills this role alongside monitoring the deadlines.

Can Flexbedrijfsarts take over an ongoing sick leave file?

Yes. The company doctor reads the reintegration file, requests the medical records from the previous company doctor and sees the employee for a first consultation. After that, the support continues under the deadlines that already apply, without a subscription. If it is unclear what is missing from the file, the takeover starts with a check of the gatekeeper file for 475 euros excluding VAT.

Hand over the sick leave process

Describe the situation and how long it has been going on. On working days, Flexbedrijfsarts calls back within 2 hours and says which step is due next.