The action plan is the form in which employer and employee set out how the employee will return to work: the end goal, the agreements and the schedule. It must be ready no later than two weeks after the company doctor (occupational physician) has completed the problem analysis, and is evaluated at least once every six weeks.

Week 8

deadline: 2 weeks after the problem analysis

Every 6 weeks

a progress meeting and an adjustment if necessary

Together

employer and employee draw it up and sign it

210 euros

action plan by a case manager, excluding VAT

A selection of our satisfied clients

  • Logo of AIDS Healthcare Foundation, client of Flexbedrijfsarts
  • Logo of Renon Power, client of Flexbedrijfsarts
  • Logo of SAJ, client of Flexbedrijfsarts
  • Logo of Channel Technologies, client of Flexbedrijfsarts
  • Logo of Hitachi Solutions, client of Flexbedrijfsarts
  • Logo of Quorn, client of Flexbedrijfsarts
  • Logo of Subway, client of Flexbedrijfsarts
  • Logo of Techary, client of Flexbedrijfsarts
  • Logo of Kubus, client of Flexbedrijfsarts
  • Logo of Oasis Rotterdam, client of Flexbedrijfsarts
  • Logo of Anterra Capital, client of Flexbedrijfsarts
  • Logo of Architech, client of Flexbedrijfsarts
  • Logo of Mondzorg Nieuwkoop, client of Flexbedrijfsarts
  • Logo of Care4sure GGZ, client of Flexbedrijfsarts
  • Logo of Kos Bouw, client of Flexbedrijfsarts
  • ZorgLogistics

  • Logo of VDH Recruitment, client of Flexbedrijfsarts
  • Logo of Fusernet, client of Flexbedrijfsarts
  • Logo of Hitachi Solutions, client of Flexbedrijfsarts
  • Logo of Subway, client of Flexbedrijfsarts
  • Logo of Quorn, client of Flexbedrijfsarts
  • Logo of AIDS Healthcare Foundation, client of Flexbedrijfsarts
  • Logo of Buitenaards, client of Flexbedrijfsarts
  • Logo of Stichting RTGS, client of Flexbedrijfsarts
  • Logo of Zintri, client of Flexbedrijfsarts
  • Logo of The Social Brand Club, client of Flexbedrijfsarts
  • Logo of Jim Exclusieve Catering, client of Flexbedrijfsarts
  • Logo of De Watertuin Abcoude, client of Flexbedrijfsarts
  • Logo of Nova Sky Stories, client of Flexbedrijfsarts
  • Logo of Tojina Schoonmaak en Glazenwasserij, client of Flexbedrijfsarts
  • FH Infra

  • Logo of Quist Schoenen, client of Flexbedrijfsarts
  • Logo of Kinderopvang De Wielenweide, client of Flexbedrijfsarts
  • Horecagroep Limburg

  • Logo of DEB Koncept, client of Flexbedrijfsarts
  • Logo of WRZ Service, client of Flexbedrijfsarts
  • Logo of Black Pepper Grill, client of Flexbedrijfsarts
  • Logo of By Castro, client of Flexbedrijfsarts
  • Logo of Artventura, client of Flexbedrijfsarts
  • Logo of Life's a Peach, client of Flexbedrijfsarts
  • Gemu Mania

  • MMT Transport

  • Quantbox

  • Logo of Chamayre's Touch, client of Flexbedrijfsarts
  • Huizer Compliance

Action plan: the short answers

What is an action plan for an employee on sick leave?

The form in which employer and employee record the end goal of the reintegration, the agreements and the schedule. It is based on the company doctor's problem analysis.

When must the action plan be ready?

No later than two weeks after the company doctor has completed the problem analysis, usually in week 8 of the sick leave. After that, it is evaluated at least once every six weeks.

What must the action plan contain?

The position and duties, the views of employee and employer on what is possible, the end goal, the agreements with a schedule, what both think of the agreements, and the signatures.

What is an adjustment to the action plan?

A change to the agreements when the situation changes, for example after new advice from the company doctor. Employer and employee record the adjustment on the UWV (Eerstejaars)evaluatie (first-year evaluation) form and both sign it.

Is an action plan mandatory?

Yes. The Gatekeeper Improvement Act (Wet verbetering poortwachter) requires employer and employee to draw it up. If it is missing from the reintegration report, the UWV can impose a wage sanction when it assesses the WIA application.

What does it cost to have an action plan drawn up?

At Flexbedrijfsarts, a case manager draws up the action plan for 210 euros, excluding VAT. No subscription and no fee per employee.

The UWV Plan van aanpak form and a completed example

On its Plan van aanpak page, the UWV describes what belongs in the action plan and which agreements it can contain, but does not offer a downloadable file there (as of 23 October 2026). The UWV Plan van aanpak form has nine sections: employee, employer, company doctor, position and duties, views of employee and employer, end goal, agreements by topic, the reason if the plan is late, and the signatures.

The completed example from Flexbedrijfsarts follows those sections, using the case of a warehouse employee returning to their own job. The example is fictitious and contains no medical information. Employer and employee record an adjustment to the plan on the UWV (Eerstejaars)evaluatie form, which can be downloaded as a Word file.

Form and example

Completed example (pdf)

Fictitious action plan with all nine sections and the agreements by topic.

The UWV form

The UWV Plan van aanpak page describes the content but does not include a downloadable file.

Adjustment

On the (Eerstejaars)evaluatie form, evaluated at least once every six weeks.

What is in the UWV action plan?

The UWV has a standard Plan van aanpak form. Employer and employee complete it together, based on the company doctor's problem analysis, and both sign it.

The agreements are recorded by topic, each with an activity and a schedule. If the plan is completed more than two weeks after the problem analysis, the form asks for the reason.

The sections of the form

Position and duties

The work the employee did before reporting sick.

View on what is possible

What employee and employer each see as options for working again, or working more.

End goal

For example, a return to the employee's own job, adapted work or other work.

Agreements and schedule

By topic: working conditions, terms of employment, working relationships, socio-medical matters and other matters.

View on the agreements and signatures

What both think of the agreements, and the signatures of employer and employee.

Fictitious example

Section

Completed

Who

Position

Warehouse employee, 32 hours per week, order picking and loading

Employer

Employee's view

Wants to return to own job, initially without heavy lifting

Employee

Employer's view

Temporary work in the packing department is possible

Employer

End goal

Return to own job, 32 hours per week

Together

Socio-medical

Physiotherapy twice a week; follow-up consultation with the company doctor in four weeks

Employee

Workplace

No lifting over 10 kilos for six weeks; start with 4 hours of packing per day

Employer

Schedule

Increase to 6 hours per day after three weeks; first evaluation after six weeks

Together

A completed example of the action plan

An example shows how specific the agreements must be. The example is fictitious: a warehouse employee with back problems who, according to the problem analysis, can eventually return to their own job.

A good agreement states what happens, who does it and when. General wording such as ‘build up gradually’ is too vague for the UWV.

From problem analysis to adjustment

The action plan is not a one-off document. At least once every six weeks, employer and employee discuss the progress, and if the situation changes, they adjust the plan.

A case manager monitors the agreements and is the point of contact when something does not go as planned.

The action plan cycle

1

Week 6

The company doctor draws up the problem analysis.

2

Week 8 at the latest

Employer and employee draw up the action plan together and sign it.

3

Every 6 weeks

Progress meeting; the agreements and the schedule are reviewed.

4

After a change

Adjustment of the plan, recorded on the evaluation form.

5

Week 52

The first-year evaluation sets the course for the second year of sick leave.

Employee

What options does the employee see?

What the employee thinks they can do, which work feels suitable and what is needed to do it.

Employer

What options does the employer see?

What work is available within the organisation, which adjustments are possible and what the employer does to make them happen.

The views of employer and employee

From 1 July 2023, employer and employee both give their view on the reintegration process: when the action plan is drawn up, at every adjustment and at the first-year evaluation.

If they disagree, this is stated in the plan. This shows the UWV how the disagreement was handled, for example with a UWV expert opinion (deskundigenoordeel).

Too late, too vague or not signed

When assessing the WIA application, the UWV reviews the reintegration report, which contains the action plan and the adjustments. If something is missing or the reintegration efforts are insufficiently substantiated, the UWV can impose a wage sanction: the employer then has to continue paying wages for up to 52 weeks longer.

Common mistakes

Too late

More than two weeks after the problem analysis. The form then asks for the reason.

Too vague

Agreements without an activity, a responsible person or a date cannot be assessed.

Not adjusted

The situation changes, but the plan stays as it was.

Our rates

Individual rates, excluding VAT. No subscription and no fee per employee.

Action plan

drawn up by a case manager, with employer and employee

210 euros

Consultation with problem analysis

the basis for the action plan, in week 6

359 euros

First-year or final evaluation

the evaluation after the first year of sick leave or at the end

239 euros

Gatekeeper file check

check that the file is complete

475 euros

Follow-up consultation

on location or by video call

239 euros

Frequently asked questions

Questions about the action plan

What is in the UWV action plan?

The position and duties, the views of employee and employer on what is possible, the end goal, the agreements with an activity and a schedule for each topic, the views on the agreements and the signatures of both.

Is an action plan mandatory?

Yes. The Gatekeeper Improvement Act (Wet verbetering poortwachter) requires employer and employee to draw up an action plan. It is part of the reintegration report that the UWV assesses when the WIA application is made.

What is the deadline for the action plan?

No later than two weeks after the company doctor has completed the problem analysis, usually in week 8 of the sick leave. After that, an evaluation at least once every six weeks.

Who draws up the action plan?

Employer and employee together, based on the company doctor's problem analysis. A case manager can guide the drafting; employer and employee both sign it.

What is an adjustment to the action plan?

A change to the agreements when the situation changes, for example after new advice from the company doctor. Employer and employee record the adjustment on the evaluation form.

What if the employee disagrees with the action plan?

This is stated in the plan, under the view on the agreements. If the disagreement persists, the employer or the employee can request a UWV expert opinion.

Does the UWV have a form for the action plan?

Yes, the UWV has a Plan van aanpak form with fixed sections. Employer and employee complete it together and keep it in the reintegration file.

What does it cost to have an action plan drawn up?

At Flexbedrijfsarts, the action plan costs 210 euros, excluding VAT. The problem analysis it is based on costs 359 euros.

What if the action plan was drawn up too late?

Employer and employee then draw it up straight away and record why it is late. When assessing the WIA application, the UWV looks first at the result of the reintegration; a late action plan only counts if it led to too little or the wrong reintegration.

Does the action plan deadline move if the problem analysis is completed later?

Yes. The action plan must be ready within two weeks of the company doctor's assessment. If the problem analysis is completed later, the action plan follows two weeks after it, with the reason for the later date recorded in the file.

Last updated on 28 September 2026.

Have an action plan drawn up

Provide the date of the problem analysis. On working days we call back within 2 hours.